[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253520":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1253520,838,1,"单选题","施工方案由（ ）审批。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","企业负责人",false,{"key":16,"text":17,"correct":14},"B","企业技术负责人",{"key":19,"text":20,"correct":14},"C","项目负责人",{"key":22,"text":23,"correct":24},"D","项目技术负责人",true,"根据第4章施工组织设计及专项施工方案可知：施工方案由项目技术负责人审批。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]