[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253465":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1253465,838,1,"单选题","系统的通水试验是将给水系统的（ ）配水点同时打开，检查各排水点是否畅通，接口无渗漏现象为合格。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1\u002F2",false,{"key":16,"text":17,"correct":18},"B","1\u002F3",true,{"key":20,"text":21,"correct":14},"C","2\u002F5",{"key":23,"text":24,"correct":14},"D","3\u002F4","系统的通水试验是将给水系统的1\u002F3配水点同时打开，检查各排水点是否畅通，接口无渗漏现象为合格。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]