[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253451":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1253451,838,1,"单选题","雨水管道灌水试验的灌水高度必须到每根立管上部的雨水斗，试验持续时间（ ）h，不渗漏为合格。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1",true,{"key":16,"text":17,"correct":18},"B","1.5",false,{"key":20,"text":21,"correct":18},"C","2",{"key":23,"text":24,"correct":18},"D","1.8","雨水管道灌水试验的灌水高度必须到每根立管上部的雨水斗，试验持续时间1h，不渗漏为合格。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]