[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253432":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1253432,838,1,"单选题","施工设计未注明试压合格标准，塑料管在工作压力的1.15倍时，需稳压（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","10分钟",false,{"key":16,"text":17,"correct":14},"B","1小时",{"key":19,"text":20,"correct":14},"C","1.5小时",{"key":22,"text":23,"correct":24},"D","2小时",true,"施工设计未注明试压合格标准，塑料管在工作压力的1.15倍时，需稳压2小时。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]