[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253422":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1253422,838,1,"单选题","兆欧表按被测试对象额定电压大小选用，100v以下，宜选用及（ ）以上的兆欧表。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","250V50M?",true,{"key":16,"text":17,"correct":18},"B","500v100M?",false,{"key":20,"text":21,"correct":18},"C","1000V2000M?",{"key":23,"text":24,"correct":18},"D","2500V10000M?","兆欧表按被测试对象额定电压大小选用，100v以下，宜选用及250V50M?以上的兆欧表。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)专业管理实务 岗位知识","建筑工程",0]