[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-837-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":564},{"id":5,"name":6,"category":7,"favorite":8},837,"(设备安装施工)基础知识","建筑工程",0,9,50,1298,[13,34,46,58,70,82,94,106,115,127,139,147,159,171,179,191,203,215,227,239,251,262,271,283,291,303,315,324,336,348,360,368,380,392,404,415,427,436,444,453,461,469,481,489,500,512,524,536,548,556],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1252519,1,"单选题","工程量清单项目编码采用十二位阿拉伯数字表示，其中作为分部工程顺序码的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","一、二位",false,{"key":24,"text":25,"correct":22},"B","三、四位",{"key":27,"text":28,"correct":29},"C","五、六位",true,{"key":31,"text":32,"correct":22},"D","七、八位","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1252520,"利用坡屋顶内空间时，顶板下表面至楼面的净高超过（ ）的部位应计算全面积；",[38,40,42,44],{"key":20,"text":39,"correct":29},"2.10m",{"key":24,"text":41,"correct":22},"2.50m",{"key":27,"text":43,"correct":22},"2.00m",{"key":31,"text":45,"correct":22},"2.20m",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1252521,"某施工用机械，折旧年限为10年，年平均工作300台班，台班折旧费为800元，残值率为5%，则该机械的预算价格为（ ）万元。",[50,52,54,56],{"key":20,"text":51,"correct":22},"116.4",{"key":24,"text":53,"correct":22},"120",{"key":27,"text":55,"correct":22},"123.6",{"key":31,"text":57,"correct":29},"252.6",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1252522,"对有于围护结构的建筑物间的架空走廊，其面积应按其结构底板水平投影面积（ ）来计算。",[62,64,66,68],{"key":20,"text":63,"correct":29},"全面积",{"key":24,"text":65,"correct":22},"1\u002F2面积",{"key":27,"text":67,"correct":22},"不计算",{"key":31,"text":69,"correct":22},"1\u002F4面积",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1252523,"建筑物内的设备管道夹层（ ）建筑物面积。",[74,76,78,80],{"key":20,"text":75,"correct":22},"算在",{"key":24,"text":77,"correct":29},"不算在",{"key":27,"text":79,"correct":22},"算1\u002F2在",{"key":31,"text":81,"correct":22},"不确定",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1252524,"下列费用属于措施费用的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"差旅交通费",{"key":24,"text":89,"correct":22},"设备运杂费",{"key":27,"text":91,"correct":22},"材料包装费",{"key":31,"text":93,"correct":29},"材料二次搬运费",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1252525,"在工程造价中，工程产品具体生产过程需投入资金计划在（ ）阶段。",[98,100,102,104],{"key":20,"text":99,"correct":29},"设计",{"key":24,"text":101,"correct":22},"概算施工图预算",{"key":27,"text":103,"correct":22},"合同造价期间",{"key":31,"text":105,"correct":22},"结算",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1252526,"立体车库上，层高在2.20m及以上者应计算（ ），",[110,111,112,114],{"key":20,"text":63,"correct":29},{"key":24,"text":65,"correct":22},{"key":27,"text":113,"correct":22},"1\u002F3面积",{"key":31,"text":69,"correct":22},{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":20,"analysis":33},1252527,"采用工程量清单计价，工程造价应包括（ ）。",[119,121,123,125],{"key":20,"text":120,"correct":29},"分部分项工程费措施项目费其他项目费规费税金",{"key":24,"text":122,"correct":22},"直接工程费现场经费间接费利润税金",{"key":27,"text":124,"correct":22},"分部分项工程费间接费利润规费税金",{"key":31,"text":126,"correct":22},"直接工程费现场经费间接费利润规费税金",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":20,"analysis":33},1252528,"有围护结构的舞台灯光控制室，应按其围护结构外围水平面积计算。层高不足2.20m的应计算（ ）面积。",[131,133,135,137],{"key":20,"text":132,"correct":29},"1\u002F2",{"key":24,"text":134,"correct":22},"1\u002F3",{"key":27,"text":136,"correct":22},"1\u002F4",{"key":31,"text":138,"correct":22},"1",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},1252529,"立体车库上，层高在（ ）及以上者应计算全面积，",[143,144,145,146],{"key":20,"text":45,"correct":29},{"key":24,"text":39,"correct":22},{"key":27,"text":43,"correct":22},{"key":31,"text":41,"correct":22},{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":20,"analysis":33},1252530,"卫生器具组成安装以（ ）为计算单位。",[151,153,155,157],{"key":20,"text":152,"correct":29},"组",{"key":24,"text":154,"correct":22},"套",{"key":27,"text":156,"correct":22},"个",{"key":31,"text":158,"correct":22},"盒",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":24,"analysis":33},1252531,"按照我国有关规定，预付款的预付时间应不迟于约定的开工日期前（ ）天。",[163,165,167,169],{"key":20,"text":164,"correct":22},"6",{"key":24,"text":166,"correct":29},"7",{"key":27,"text":168,"correct":22},"8",{"key":31,"text":170,"correct":22},"9",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":20,"analysis":33},1252532,"雨篷结构的外边线至外墙结构外边线的宽度超过2.10m者，应按雨篷结构板的水平投影面积的（ ）计算。",[175,176,177,178],{"key":20,"text":132,"correct":29},{"key":24,"text":134,"correct":22},{"key":27,"text":136,"correct":22},{"key":31,"text":138,"correct":22},{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":20,"analysis":33},1252533,"按照生产要素内容，建设工程定额分为（ ）。",[183,185,187,189],{"key":20,"text":184,"correct":29},"人工定额、材料消耗定额、施工机械台班使用定额",{"key":24,"text":186,"correct":22},"施工定额、预算定额、概算定额、概算指标、投资估算指标",{"key":27,"text":188,"correct":22},"国家定额、行业定额、地区定额、企业定额",{"key":31,"text":190,"correct":22},"建设工程定额、设备安装工程定额、建筑安装工程费用定额、工程建设其他费用定额及工具、器具定额",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":24,"analysis":33},1252534,"预算定额是以特定范围的工程为对象编制的定额。这一特定范围的工程是指（ ）。",[195,197,199,201],{"key":20,"text":196,"correct":22},"独立的单项工程",{"key":24,"text":198,"correct":29},"各个分部分项工程",{"key":27,"text":200,"correct":22},"扩大的分部分项工程",{"key":31,"text":202,"correct":22},"整个建筑物",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":24,"analysis":33},1252535,"按照《建设工程量清单计价规范》规定，工程量清单（ ）。",[207,209,211,213],{"key":20,"text":208,"correct":22},"必须由招标人委托具有相应资质的中介机构进行编制",{"key":24,"text":210,"correct":29},"应作为招标文件的组成部分",{"key":27,"text":212,"correct":22},"应采用工料单价计价",{"key":31,"text":214,"correct":22},"由总说明和分部分项工程清单两部分组成",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":27,"analysis":33},1252536,"编制人工定额时要考虑（ ）。",[219,221,223,225],{"key":20,"text":220,"correct":22},"正常的施工条件",{"key":24,"text":222,"correct":22},"拟定定额时间",{"key":27,"text":224,"correct":29},"正常的施工条件及拟定定额时间",{"key":31,"text":226,"correct":22},"正常的施工条件、拟定定额时间及工人的劳动效率",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":24,"analysis":33},1252537,"《建设工程工程量清单计价规范》在我国开始实施是在（ ）。",[231,233,235,237],{"key":20,"text":232,"correct":22},"2003年2月27日",{"key":24,"text":234,"correct":29},"2003年7月1日",{"key":27,"text":236,"correct":22},"2008年12月1日",{"key":31,"text":238,"correct":22},"2008年7月1日",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":31,"analysis":33},1252538,"下列关于工程量清单的意义表述不正确的是（ ）。",[243,245,247,249],{"key":20,"text":244,"correct":22},"工程量清单有利于工程款额拨付和工程造价的最终结算",{"key":24,"text":246,"correct":22},"工程量清单是调整工程价款、处理工程索赔的依据",{"key":27,"text":248,"correct":22},"为投标人提供一个平等和共同的竞争基础",{"key":31,"text":250,"correct":29},"工程量清单是制定《计价规范》的依据",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":20,"analysis":33},1252539,"以幕墙作为围护结构的建筑物，应按（ ）计算建筑面积。",[255,257,259,261],{"key":20,"text":256,"correct":29},"幕墙外边线",{"key":24,"text":258,"correct":22},"幕墙内边线",{"key":27,"text":260,"correct":22},"幕墙内外边线取平均值",{"key":31,"text":81,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1252540,"普通灯具安装的工程量，应区别灯具的种类、型号、规格，以（ ）为计算单位。",[266,267,268,269],{"key":20,"text":154,"correct":29},{"key":24,"text":156,"correct":22},{"key":27,"text":158,"correct":22},{"key":31,"text":270,"correct":22},"支",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},1252541,"建筑物外墙外侧有保温隔热层的，应按（ ）计算建筑面积。",[275,277,279,281],{"key":20,"text":276,"correct":22},"保温隔热层内边线",{"key":24,"text":278,"correct":29},"保温隔热层外边线",{"key":27,"text":280,"correct":22},"保温隔热层内外边线",{"key":31,"text":282,"correct":22},"中间部位不确定",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":27,"analysis":33},1252542,"单层建筑物高度在（ ）及以上者应计算全面积。",[287,288,289,290],{"key":20,"text":43,"correct":22},{"key":24,"text":39,"correct":22},{"key":27,"text":45,"correct":29},{"key":31,"text":41,"correct":22},{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":24,"analysis":33},1252543,"下列不属于分部分项工程费的是（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":22},"人工费",{"key":24,"text":298,"correct":29},"规费",{"key":27,"text":300,"correct":22},"施工机械使用费",{"key":31,"text":302,"correct":22},"企业管理费",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":27,"analysis":33},1252544,"斗容量为1m3的挖掘机9挖三类土，装车，深度3m内9小组成员2人，机械台班产量为4.8（定额单位100m3），则挖100m3的人工时间定额为（ ）。",[307,309,311,313],{"key":20,"text":308,"correct":22},"0.19工日",{"key":24,"text":310,"correct":22},"0.38工日",{"key":27,"text":312,"correct":29},"0.42工日",{"key":31,"text":314,"correct":22},"1.5工日",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":27,"analysis":33},1252545,"雨篷结构的外边线至外墙结构外边线的宽度超过（ ）者，应按雨篷结构板的水平投影面积的1\u002F2计算。",[319,321,322,323],{"key":20,"text":320,"correct":22},"1.20m",{"key":24,"text":43,"correct":22},{"key":27,"text":39,"correct":29},{"key":31,"text":45,"correct":22},{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":31,"analysis":33},1252546,"以下哪一项不应计人人工费（ ）。",[328,330,332,334],{"key":20,"text":329,"correct":22},"辅助工资",{"key":24,"text":331,"correct":22},"生产工人基本工资",{"key":27,"text":333,"correct":22},"生产工人工资性补贴",{"key":31,"text":335,"correct":29},"职工养老保险",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},1252547,"建安工程造价中的税金不包括（ ）。",[340,342,344,346],{"key":20,"text":341,"correct":22},"营业税",{"key":24,"text":343,"correct":29},"所得税",{"key":27,"text":345,"correct":22},"城乡维护建设税",{"key":31,"text":347,"correct":22},"教育费附加",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1252548,"国家建设行政主管部门组织编制和发布，并在全国范围内使用的定额是（ ）。",[352,354,356,358],{"key":20,"text":353,"correct":29},"国家定额",{"key":24,"text":355,"correct":22},"全国定额",{"key":27,"text":357,"correct":22},"行业定额",{"key":31,"text":359,"correct":22},"地区定额",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},1252549,"立体车库上，层高不足2.20m的应计算（ ）面积。",[364,365,366,367],{"key":20,"text":132,"correct":29},{"key":24,"text":134,"correct":22},{"key":27,"text":136,"correct":22},{"key":31,"text":138,"correct":22},{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},1252550,"生产某产品的工人小组由5人组成，产量定额为2㎡\u002F工日，则时间定额应为（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":29},"0.5工日\u002F㎡",{"key":24,"text":375,"correct":22},"0.2工日\u002F㎡",{"key":27,"text":377,"correct":22},"0.67工日\u002F㎡",{"key":31,"text":379,"correct":22},"2.5工日\u002F㎡",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},1252551,"编制项目建议书和可行性研究报告书投资估算的依据是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"预算定额",{"key":24,"text":387,"correct":22},"概算定额",{"key":27,"text":389,"correct":22},"概算指标",{"key":31,"text":391,"correct":29},"投资估算指标",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":24,"analysis":33},1252552,"在工程造价中，用以衡量、评价、完善工程设计方案的阶段是（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"设计概算",{"key":24,"text":399,"correct":29},"施工图预算",{"key":27,"text":401,"correct":22},"合同造价",{"key":31,"text":403,"correct":22},"期间结算",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":31,"analysis":33},1252553,"下列不属于材料预算价格的费用是（ ）。",[408,410,411,413],{"key":20,"text":409,"correct":22},"材料原价",{"key":24,"text":91,"correct":22},{"key":27,"text":412,"correct":22},"材料采购保管费",{"key":31,"text":414,"correct":29},"新型材料实验费",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},1252554,"下面哪项应计算建筑面积（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"与建筑物内不相连通的建筑部件",{"key":24,"text":422,"correct":22},"骑楼",{"key":27,"text":424,"correct":22},"过街楼底层的开放公共空间",{"key":31,"text":426,"correct":29},"结构层高在2.20m以下的管道间",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},1252555,"以建筑物或构筑物各个分部分项工程为对象编制的定额是（ ）。",[431,433,434,435],{"key":20,"text":432,"correct":22},"施工定额",{"key":24,"text":385,"correct":29},{"key":27,"text":387,"correct":22},{"key":31,"text":389,"correct":22},{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":27,"analysis":33},1252556,"设计单位编制设计概算或建设单位编制年度投资计划的依据是（ ）。",[440,441,442,443],{"key":20,"text":432,"correct":22},{"key":24,"text":387,"correct":22},{"key":27,"text":389,"correct":29},{"key":31,"text":391,"correct":22},{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":24,"analysis":33},1252557,"建筑物内操作平台（ ）建筑物面积。",[448,449,450,451],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":29},{"key":27,"text":79,"correct":22},{"key":31,"text":452,"correct":22},"不确定；",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},1252558,"建筑物的阳台均应按其水平投影面积的（ ）计算。",[457,458,459,460],{"key":20,"text":138,"correct":22},{"key":24,"text":132,"correct":29},{"key":27,"text":134,"correct":22},{"key":31,"text":136,"correct":22},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},1252559,"有围护结构的舞台灯光控制室，应按其围护结构外围水平面积计算。层高在（ ）及以上者应计算全面积。层高不足2.20m的应计算1\u002F2面积。",[465,466,467,468],{"key":20,"text":45,"correct":29},{"key":24,"text":39,"correct":22},{"key":27,"text":43,"correct":22},{"key":31,"text":41,"correct":22},{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":27,"analysis":33},1252560,"在时间定额的概念中，每个工日表示（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"6小时",{"key":24,"text":476,"correct":22},"7小时",{"key":27,"text":478,"correct":29},"8小时",{"key":31,"text":480,"correct":22},"9小时",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":20,"analysis":33},1252561,"可以反映施工企业生产与组织的技术水平和管理水平的是（ ）。",[485,486,487,488],{"key":20,"text":432,"correct":29},{"key":24,"text":387,"correct":22},{"key":27,"text":389,"correct":22},{"key":31,"text":385,"correct":22},{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":31,"analysis":33},1252562,"生产某产品的工人小组由5人组成，每个小组的人员工日数为1工日，机械台班产量为4㎡\u002F工日，则时间定额应为（ ）。",[493,494,496,498],{"key":20,"text":373,"correct":22},{"key":24,"text":495,"correct":22},"0.98工日\u002F㎡",{"key":27,"text":497,"correct":22},"1.03工日\u002F㎡",{"key":31,"text":499,"correct":29},"1.25工日\u002Frn2",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":31,"analysis":33},1252563,"下列方法中，可以用来测定人工定额的是（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"理论计算法",{"key":24,"text":507,"correct":22},"图纸计算法",{"key":27,"text":509,"correct":22},"假设法",{"key":31,"text":511,"correct":29},"比较类推法",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},1252564,"甲单位与乙单位于2013年3月5日就某消防工程签订施工总承包合同，甲作为该工程的施工总承包单位，该工程建筑面积为20000㎡，合同约定本工程于2013年3月15日开工，开工初期，甲需采购5t角钢制作支架，角钢的供应价格为4100元\u002Ft,运费为70元\u002Ft,运输损耗0.2％，采购保管费率为1％。 本工程属于（ ）类工程。",[516,518,520,522],{"key":20,"text":517,"correct":29},"一类",{"key":24,"text":519,"correct":22},"二类",{"key":27,"text":521,"correct":22},"三类",{"key":31,"text":523,"correct":22},"四类",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":27,"analysis":33},1252565,"下列哪一项不属于必需消耗的时间（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"有效工作时间",{"key":24,"text":531,"correct":22},"自然需要的时间",{"key":27,"text":533,"correct":29},"停工时间",{"key":31,"text":535,"correct":22},"不可避免的中断时间",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},1252566,"某新建工程，采购一批型钢200t，此型钢的供应价格为4280元\u002Ft，运费为60元\u002Ft，运输损耗为0.25%，采购保管费率为1％，则该型钢的预算价格为（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"3999.9",{"key":24,"text":543,"correct":22},"4030",{"key":27,"text":545,"correct":22},"4350.85",{"key":31,"text":547,"correct":29},"4394.36",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},1252567,"独立烟囱（ ）建筑物面积。",[552,553,554,555],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":29},{"key":27,"text":79,"correct":22},{"key":31,"text":81,"correct":22},{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},1252568,"有永久性顶盖无围护结构的场馆看台应按其顶盖水平投影面积的（ ）。",[560,561,562,563],{"key":20,"text":132,"correct":29},{"key":24,"text":134,"correct":22},{"key":27,"text":136,"correct":22},{"key":31,"text":138,"correct":22},[565,568,571,574,577,580],{"id":15,"name":566,"category":7,"favorite":567},"领导干部任职前廉政法规知识测试题",92,{"id":569,"name":570,"category":7,"favorite":15},595,"建筑结构与设备",{"id":572,"name":573,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":575,"name":576,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":578,"name":579,"category":7,"favorite":8},534,"BIM工程师",{"id":581,"name":579,"category":7,"favorite":8},535]