[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253369":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1253369,837,3,"判断题","招标人在工程量清单中提供的用于支付必然发生但暂时不能确定价格的材料的单价以及专业工程的金额称为暂列金额。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"暂估价：建设单位在工程量清单中提供的用于支付必然发生但暂时不能确定价格的材料的单价以及专业工程的金额，包括材料暂估价和专业工程暂估价。材料暂估价在清单综合单价中考虑，不计入暂估价汇总。",{"id":6,"name":21,"category":22,"favorite":23},"(设备安装施工)基础知识","建筑工程",0]