[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253125":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1253125,837,2,"多选题","分部分项工程清单应该包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","项目编码",true,{"key":16,"text":17,"correct":14},"B","项目名称",{"key":19,"text":20,"correct":14},"C","项目特征",{"key":22,"text":23,"correct":14},"D","计量单位",{"key":25,"text":26,"correct":14},"E","工程量","ABCDE","分部分项工程清单应该包括项目编码、项目名称、项目特征、计量单位和工程量。",{"id":6,"name":30,"category":31,"favorite":32},"(设备安装施工)基础知识","建筑工程",0]