[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1253119":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1253119,837,2,"多选题","直接工程费包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","人工费",true,{"key":16,"text":17,"correct":18},"B","二次、搬运费",false,{"key":20,"text":21,"correct":14},"C","材料费",{"key":23,"text":24,"correct":14},"D","施工机械使用费",{"key":26,"text":27,"correct":18},"E","检验试验费","ACD","直接费用包括人工费、材料费和施工机械使用费。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装施工)基础知识","建筑工程",0]