[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1252748":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1252748,837,1,"单选题","《机械设备安装工程施工及验收通用规范》规定的机械设备安装工程起止范围是：从（ ）起，至空负荷试运转验收合格为止",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设备开箱检查",true,{"key":16,"text":17,"correct":18},"B","基础测量放线",false,{"key":20,"text":21,"correct":18},"C","设备安装调整",{"key":23,"text":24,"correct":18},"D","基础检查验收","机械设备安装的一般程序为：施工准备、设备开箱检查、基础测量放线、基础检查验收、垫铁设置、设备吊装就位、设备安装调整、设备固定与灌浆、零部件清洗与装配、润滑与设备加油、设备试运转、工程验收。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)基础知识","建筑工程",0]