[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1252679":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1252679,837,1,"单选题","架空线路导线架设应在（ ）及调整后进行。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","跳线连接",false,{"key":16,"text":17,"correct":14},"B","绝缘子安装",{"key":19,"text":20,"correct":21},"C","拉线安装",true,{"key":23,"text":24,"correct":14},"D","横担安装","架空电力线路安装程序为：挖电杆和拉线坑一基础埋设一电杆组合一横担安装一绝缘子安装一立杆一拉线安装一导线架设。架空电力线路电杆组立后进行拉线安装及调整，方可进行导线架设：",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)基础知识","建筑工程",0]