[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1252577":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1252577,837,1,"单选题","某施工单位甲与地产公司乙签订一份某工程的施工合同，合同中约定工程开工时间2013年4月1日，地产公司乙最迟应在（ ）支付施工单位甲本工程的预付款。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","2013.3.25",true,{"key":16,"text":17,"correct":18},"B","2013.3.6",false,{"key":20,"text":21,"correct":18},"C","2013.4.1",{"key":23,"text":24,"correct":18},"D","2013.4.8","按照我国有关规定，预付款的预付时间应不迟于约定的开工日期前7天。发包方不按约定预付的，承包方在约定预付时间7天后向发包方发出要求预付的通知。合同中约定工程开工时间2013年4月1日，故地产公司乙最迟应在3月25日支付施工单位甲本工程的预付款。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)基础知识","建筑工程",0]