[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1252553":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1252553,837,1,"单选题","下列不属于材料预算价格的费用是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","材料原价",false,{"key":16,"text":17,"correct":14},"B","材料包装费",{"key":19,"text":20,"correct":14},"C","材料采购保管费",{"key":22,"text":23,"correct":24},"D","新型材料实验费",true,"新型材料实验费不属于材料预算价格。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)基础知识","建筑工程",0]