[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1252538":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1252538,837,1,"单选题","下列关于工程量清单的意义表述不正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程量清单有利于工程款额拨付和工程造价的最终结算",false,{"key":16,"text":17,"correct":14},"B","工程量清单是调整工程价款、处理工程索赔的依据",{"key":19,"text":20,"correct":14},"C","为投标人提供一个平等和共同的竞争基础",{"key":22,"text":23,"correct":24},"D","工程量清单是制定《计价规范》的依据",true,"工程量清单有利于工程款额拨付和工程造价的最终结算；工程量清单是调整工程价款、处理工程索赔的依据；为投标人提供一个平等和共同的竞争基础",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)基础知识","建筑工程",0]