[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1252536":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1252536,837,1,"单选题","编制人工定额时要考虑（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","正常的施工条件",false,{"key":16,"text":17,"correct":14},"B","拟定定额时间",{"key":19,"text":20,"correct":21},"C","正常的施工条件及拟定定额时间",true,{"key":23,"text":24,"correct":14},"D","正常的施工条件、拟定定额时间及工人的劳动效率","编制人工定额时要考虑正常的施工条件及拟定定额时间。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)基础知识","建筑工程",0]