[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1252527":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1252527,837,1,"单选题","采用工程量清单计价，工程造价应包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分部分项工程费措施项目费其他项目费规费税金",true,{"key":16,"text":17,"correct":18},"B","直接工程费现场经费间接费利润税金",false,{"key":20,"text":21,"correct":18},"C","分部分项工程费间接费利润规费税金",{"key":23,"text":24,"correct":18},"D","直接工程费现场经费间接费利润规费税金","按照清单计价，工程造价应包括：分部分项工程费、措施项目费、其他项目费、规费、税金",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)基础知识","建筑工程",0]