[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1252467":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1252467,837,1,"单选题","卫生器具交付前应作（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","试压",false,{"key":16,"text":17,"correct":18},"B","满水试验",true,{"key":20,"text":21,"correct":14},"C","通球试验",{"key":23,"text":24,"correct":14},"D","灌水试验","卫生器具交工前应作满水和通水试验，进行调试，卫生器具的满水试验可结合排水管道满水试验一同进行，也可单独将卫生器具的排水口堵住，盛满水进行检查，各连接件不渗不漏为合格。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)基础知识","建筑工程",0]