[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1252371":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1252371,837,1,"单选题","隐蔽或埋地的排水管道在隐蔽前必须做灌水试验，其灌水高度应不低于底层卫生器具的上边缘或底层地面高度。检验方法：满水（ ）水面下降后，再灌满观察（ ），液面不降，管道及接口无渗漏为合格。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","15min15min",false,{"key":16,"text":17,"correct":14},"B","5min5min",{"key":19,"text":20,"correct":14},"C","5min15min",{"key":22,"text":23,"correct":24},"D","15min5min",true,"隐蔽或埋地的排水管道在隐蔽前必须做灌水试验，其灌水高度应不低于底层卫生器具的上边缘或底层地面高度。检验方法：满水15min水面下降后，再灌满观察5min，液面不降，管道及接口无渗漏为合格。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装施工)基础知识","建筑工程",0]