[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171690":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1171690,836,1,"单选题","施工预算是在( )编制的。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目评估阶段",false,{"key":16,"text":17,"correct":14},"B","项目设计阶段",{"key":19,"text":20,"correct":21},"C","项目施工阶段",true,{"key":23,"text":24,"correct":14},"D","项目验收阶段","",{"id":6,"name":27,"category":28,"favorite":29},"通用基础","建筑工程",0]