[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171584":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1171584,836,1,"单选题","施工项目控制的任务是进行以项目进度控制、质量控制、成本控制和安全控制为主要内容的四大目标控制。其中下列不属于与施工项目成果相关的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","进度控制",false,{"key":16,"text":17,"correct":18},"B","安全控制",true,{"key":20,"text":21,"correct":14},"C","质量控制",{"key":23,"text":24,"correct":14},"D","成本控制","",{"id":6,"name":27,"category":28,"favorite":29},"通用基础","建筑工程",0]