[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171582":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1171582,836,1,"单选题","下列各项措施中,不属于施工项目质量控制的措施的是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","提高管理、施工及操作人员自身素质",false,{"key":16,"text":17,"correct":14},"B","提高施工的质量管理水平",{"key":19,"text":20,"correct":21},"C","尽可能采用先进的施工技术、方法和新材料、新工艺、新技术,保证进度目标实现",true,{"key":23,"text":24,"correct":14},"D","加强施工项目的过程控制","",{"id":6,"name":27,"category":28,"favorite":29},"通用基础","建筑工程",0]