[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171457":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1171457,835,2,"多选题","施工图设计文件审查通知书及审查报告过程保存的单位是( )单位。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","施工",true,{"key":16,"text":17,"correct":14},"B","监理",{"key":19,"text":20,"correct":21},"C","建设",false,{"key":23,"text":24,"correct":21},"D","城建档案馆",{"key":26,"text":27,"correct":21},"E","相关","AB","",{"id":6,"name":31,"category":32,"favorite":33},"岗位技能","建筑工程",0]