[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171422":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1171422,835,2,"多选题","同一( )的施工物资用在两个分部、子分部工程中时,资料编号中的分部、子分部工程代号可按主要使用部位填写。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","厂家",true,{"key":16,"text":17,"correct":14},"B","品种",{"key":19,"text":20,"correct":21},"C","规格",false,{"key":23,"text":24,"correct":14},"D","批次",{"key":26,"text":27,"correct":21},"E","型号","ABD","",{"id":6,"name":31,"category":32,"favorite":33},"岗位技能","建筑工程",0]