[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171411":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1171411,835,2,"多选题","施工资料收集后主要审查的内容可分为( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","表头填写",true,{"key":16,"text":17,"correct":18},"B","表中填写",false,{"key":20,"text":21,"correct":18},"C","表尾填写",{"key":23,"text":24,"correct":14},"D","资料编制内容",{"key":26,"text":27,"correct":14},"E","资料报送结论","ADE","",{"id":6,"name":31,"category":32,"favorite":33},"岗位技能","建筑工程",0]