[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171401":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1171401,835,2,"多选题","建筑工程资料宜优先采用计算机管理,使( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","管理规范化",true,{"key":16,"text":17,"correct":14},"B","标准化",{"key":19,"text":20,"correct":21},"C","程序化",false,{"key":23,"text":24,"correct":21},"D","模式化",{"key":26,"text":27,"correct":14},"E","电子信息化","ABE","",{"id":6,"name":31,"category":32,"favorite":33},"岗位技能","建筑工程",0]