[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171279":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":28},1171279,835,1,"单选题","单位（子单位）工程质量验收程序及资料管理流程有①分部（子分部）施工完成②预验收③工程移交④验收( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","①②③④",false,{"key":16,"text":17,"correct":14},"B","②④①③",{"key":19,"text":20,"correct":21},"C","①②④③",true,{"key":23,"text":24,"correct":14},"D","③①②④",{"key":26,"text":27,"correct":14},"E","③④①②","",{"id":6,"name":30,"category":31,"favorite":32},"岗位技能","建筑工程",0]