[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-834-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":554},{"id":5,"name":6,"category":7,"favorite":8},834,"(资料员)专业管理实务 岗位知识","建筑工程",0,6,50,1056,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,185,197,209,219,227,239,251,260,272,284,296,308,316,328,338,350,361,373,385,393,401,413,421,430,442,454,462,470,478,486,494,502,514,522,533,545],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1170381,1,"单选题","检索主要有下列几个步骤：①分析利用要求；②选定检索工具，确定检索途径和方法，如按分类途径、按主题途径，或按全宗构成者、责任者、年代以及其他途径检索；③按照选定的检索途径及其检索标识，如分类号、主题词等查取施工资料；④通过一定的方式，将施工资料或编成的目录提供给利用者。其中排序正确的是（）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","①②③④",true,{"key":24,"text":25,"correct":26},"B","④③②①",false,{"key":28,"text":29,"correct":26},"C","③④①②",{"key":31,"text":32,"correct":26},"D","②③①④","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1170382,"施工资料的传递过程中，主要考虑的内容有（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"决定分发的项目、内容、分发量、范围、数据来源",{"key":24,"text":41,"correct":26},"允许检索的范围",{"key":28,"text":43,"correct":26},"检索的密级划分",{"key":31,"text":45,"correct":26},"密码的管理",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1170383,"电子文件的鉴定工作不包括的是（）",[50,52,54,56],{"key":20,"text":51,"correct":22},"对电子文件的合法性的鉴定",{"key":24,"text":53,"correct":26},"对电子文件的完整性的鉴定",{"key":28,"text":55,"correct":26},"对电子文件的有效性的鉴定",{"key":31,"text":57,"correct":26},"确定归档范围、划定保管期限",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1170384,"为了保障施工资料的信息安全，采用计算管理施工资料的单位和部门从组织制度上采取的措施是（）",[62,64,66,68],{"key":20,"text":63,"correct":26},"计算机房应有出人管理制度",{"key":24,"text":65,"correct":22},"有应对突发事件的预案",{"key":28,"text":67,"correct":26},"内部局域网与外部互联网要进行物理隔离",{"key":31,"text":69,"correct":26},"计算机应安装杀毒软件",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1170385,"某施工单位对所收集的电子文件进行编码时，对于图像文件的类别代码是（）",[74,76,78,80],{"key":20,"text":75,"correct":26},"T",{"key":24,"text":77,"correct":22},"I",{"key":28,"text":79,"correct":26},"G",{"key":31,"text":81,"correct":26},"V",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1170386,"各资料科（室）每年定期对存档资料安全保管情况进行（）﹪的安全性抽样检查。",[86,88,90,92],{"key":20,"text":87,"correct":22},"10",{"key":24,"text":89,"correct":26},"20",{"key":28,"text":91,"correct":26},"30",{"key":31,"text":93,"correct":26},"40",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1170387,"凡向公共信息网络提供或者发布信息，必须经本单位（）审查批准，并按照规定的工作程序，完善和落实信息登记、审批责任制。",[98,100,102,104],{"key":20,"text":99,"correct":26},"技术负责人或质安部门负责人",{"key":24,"text":101,"correct":26},"质安部门负责人或项目经理",{"key":28,"text":103,"correct":26},"项目经理或资料员",{"key":31,"text":105,"correct":22},"本单位主要领导或分管领导",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1170388,"具有参考和利用价值并作为档案保存的建设电子文件及相应的支持软件、参数和其他相关数据是是（）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"建设电子文件",{"key":24,"text":113,"correct":26},"建设系统业务管理电子文件",{"key":28,"text":115,"correct":26},"建设工程电子文件",{"key":31,"text":117,"correct":22},"建设电子档案",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1170389,"资料室（库）应配有防有害生物的药品，有效控制面积应达到（）﹪。",[122,124,126,128],{"key":20,"text":123,"correct":26},"70",{"key":24,"text":125,"correct":26},"80",{"key":28,"text":127,"correct":26},"90",{"key":31,"text":129,"correct":22},"100",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1170390,"通过计算机网络将电子文件及相关数据向档案部门移交的过程称为（）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"固化",{"key":24,"text":137,"correct":26},"迁移",{"key":28,"text":139,"correct":22},"在线归档",{"key":31,"text":141,"correct":26},"离线归档",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1170391,"资料室湿度应控制在（）﹪。",[146,148,150,152],{"key":20,"text":147,"correct":26},"30~45（±5）",{"key":24,"text":149,"correct":22},"45~60（±5）",{"key":28,"text":151,"correct":26},"50~65（±5）",{"key":31,"text":153,"correct":26},"55~70（±5）",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1170392,"建设电子文件的归档范围、保管期限应按照（）有关规定执行。",[158,160,162,164],{"key":20,"text":159,"correct":22},"纸质文件材料",{"key":24,"text":161,"correct":26},"文字信息材料",{"key":28,"text":163,"correct":26},"工程电子竣工图",{"key":31,"text":165,"correct":26},"一次写光盘文件材料",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1170393,"适用于脱机存储电子档案的载体有①磁带、②可擦写光盘、③一次写光盘、④硬磁盘等，若按照保存寿命长短和可靠程度强弱排序正确的是（）",[170,171,173,175],{"key":20,"text":21,"correct":26},{"key":24,"text":172,"correct":26},"②①③④",{"key":28,"text":174,"correct":26},"③②①④",{"key":31,"text":176,"correct":22},"③①②④",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1170394,"在建设系统各行业、专业管理部门在业务管理和业务技术活动中通过数字设备及环境生成的，以数码形式存储于磁带、磁盘或光盘等载体，依赖计算机等数字设备阅读、处理，并可在通信网络上传送的业务及技术文件是是（）。",[181,182,183,184],{"key":20,"text":111,"correct":26},{"key":24,"text":113,"correct":22},{"key":28,"text":115,"correct":26},{"key":31,"text":117,"correct":26},{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":24,"analysis":33},1170395,"电子文件与电子档案形成保管单位应从制度上采取与（）相符的网络设备安全保证、数据安全保证、操作安全保证、身份识别方法等防范对策。",[189,191,193,195],{"key":20,"text":190,"correct":26},"数据安全和保密等级",{"key":24,"text":192,"correct":22},"系统安全和保密等级",{"key":28,"text":194,"correct":26},"设备安全和身份识别",{"key":31,"text":196,"correct":26},"数据安全和身份识别",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},1170396,"某单位基建处负责单位新建办公楼的任务。该办公楼为钢筋混凝土框架结构，地上4层、地下1层，建筑面积为10000㎡.该单位基建处通过招标投标，选择由甲监理公司负责该办公楼施工监理工作、乙建筑公司承担该办公楼的施工工作。工程于2011年6月10日开工，2011年9月19日完工，并通过了竣工验收。工程施工期间，建设单位、监理单位和施工单位共同利用当地工程档案资料管理系统进行工程资料的日常管理。 该单位基建处工程资料管理人员对施工单位移交的工程建设电子档案进行检验时，下列重点检查内容中描述错误的是（）。",[201,203,205,207],{"key":20,"text":202,"correct":22},"建设电子档案的准确性、完整性、有效性",{"key":24,"text":204,"correct":26},"建设电子档案与纸质档案是否一致、是否已建立关联",{"key":28,"text":206,"correct":26},"载体有无病毒、有无划痕",{"key":31,"text":208,"correct":26},"登记表、著录数据、软件、说明资料等是否齐全",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":28,"analysis":33},1170397,"为避免电子文件因动态因素造成信息缺损的现象，而将其转换为一种相对稳定的通用文件格式的过程称为（）。",[213,215,217,218],{"key":20,"text":214,"correct":26},"溯源",{"key":24,"text":216,"correct":26},"保全",{"key":28,"text":135,"correct":22},{"key":31,"text":137,"correct":26},{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":28,"analysis":33},1170398,"在工程建设过程中通过数字设备及环境生成，以数码形式存储于磁带、磁盘或光盘等载体，依赖计算机等数字设备阅读、处理，并可在通信网络上传送的文件是（）",[223,224,225,226],{"key":20,"text":111,"correct":26},{"key":24,"text":113,"correct":26},{"key":28,"text":115,"correct":22},{"key":31,"text":117,"correct":26},{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":28,"analysis":33},1170399,"某单位基建处负责单位新建办公楼的任务。该办公楼为钢筋混凝土框架结构，地上4层、地下1层，建筑面积为10000㎡.该单位基建处通过招标投标，选择由甲监理公司负责该办公楼施工监理工作、乙建筑公司承担该办公楼的施工工作。工程于2011年6月10日开工，2011年9月19日完工，并通过了竣工验收。工程施工期间，建设单位、监理单位和施工单位共同利用当地工程档案资料管理系统进行工程资料的日常管理。 该单位基建处工程资料管理人员在建设工程电子文件的整理归档和移交中的工作是（）。",[231,233,235,237],{"key":20,"text":232,"correct":26},"收集和积累该办楼工程施工阶段形成的电子文件，并进行整理归档",{"key":24,"text":234,"correct":26},"从工程档案资料管理系统中下载分项工程检验批验收记录空白表",{"key":28,"text":236,"correct":22},"收集和汇总甲监理公司、乙建筑公司等单位形成的电子档案",{"key":31,"text":238,"correct":26},"工程竣工验收后，组织对新建办公楼电子档案预验收",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":28,"analysis":33},1170400,"电子文件的内容、结构、背景信息、元数据等无缺损，体现了建设电子文件与电子档案（）。",[243,245,247,249],{"key":20,"text":244,"correct":26},"真实性",{"key":24,"text":246,"correct":26},"准确性",{"key":28,"text":248,"correct":22},"完整性",{"key":31,"text":250,"correct":26},"有效性",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":20,"analysis":33},1170401,"电子文件的内容、结构和背景信息等与形成时的原始状况一致，体现了建设电子文件与电子档案的（）。",[255,256,258,259],{"key":20,"text":244,"correct":22},{"key":24,"text":257,"correct":26},"实用性",{"key":28,"text":248,"correct":26},{"key":31,"text":250,"correct":26},{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":28,"analysis":33},1170402,"某单位基建处负责单位新建办公楼的任务。该办公楼为钢筋混凝土框架结构，地上4层、地下1层，建筑面积为10000㎡.该单位基建处通过招标投标，选择由甲监理公司负责该办公楼施工监理工作、乙建筑公司承担该办公楼的施工工作。工程于2011年6月10日开工，2011年9月19日完工，并通过了竣工验收。工程施工期间，建设单位、监理单位和施工单位共同利用当地工程档案资料管理系统进行工程资料的日常管理。 该单位基建处工程资料管理人员将收集的开工典礼录像资料，以（）格式进行存档保存。",[264,266,268,270],{"key":20,"text":265,"correct":26},"DOC",{"key":24,"text":267,"correct":26},"JPEG",{"key":28,"text":269,"correct":22},"MPEG",{"key":31,"text":271,"correct":26},"MP3",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":20,"analysis":33},1170403,"钢材试验报告按（）列细目录。",[276,278,280,282],{"key":20,"text":277,"correct":22},"规格、型号",{"key":24,"text":279,"correct":26},"检验批",{"key":28,"text":281,"correct":26},"子分部",{"key":31,"text":283,"correct":26},"分项",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":28,"analysis":33},1170404,"施工单位填写的建筑节能分部工程质量验收记录应一式（）份",[288,290,292,294],{"key":20,"text":289,"correct":26},"二",{"key":24,"text":291,"correct":26},"三",{"key":28,"text":293,"correct":22},"四",{"key":31,"text":295,"correct":26},"五",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},1170405,"涉及结构安全的试块试件和材料见证取样和送检的比例不得低于有关技术标准中规定应取样数量的（）。",[300,302,304,306],{"key":20,"text":301,"correct":26},"10%",{"key":24,"text":303,"correct":26},"20%",{"key":28,"text":305,"correct":22},"30%",{"key":31,"text":307,"correct":26},"40%",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},1170406,"施工单位填写的单位（子单位）工程质量竣工验收记录应一式（）份。",[312,313,314,315],{"key":20,"text":289,"correct":26},{"key":24,"text":291,"correct":26},{"key":28,"text":293,"correct":26},{"key":31,"text":295,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},1170407,"某建筑公司甲项目部承建某学校办公楼的施工任务。该办公楼为六层钢筋混凝土框架结构、柱下条型基础，建筑面积为10000㎡.工程于2001年7月20日开工，至2012年12月20日完工并通过了竣工验收。 甲项目部资料员对施工文件资料进行整理、立卷和归档的时间是（）。",[320,322,324,326],{"key":20,"text":321,"correct":22},"工程竣工验收前",{"key":24,"text":323,"correct":26},"工程竣工验收后",{"key":28,"text":325,"correct":26},"竣工备案前",{"key":31,"text":327,"correct":26},"竣工备案后",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":28,"analysis":33},1170408,"钢筋试验批量每批不超过（）t。",[332,333,335,337],{"key":20,"text":93,"correct":26},{"key":24,"text":334,"correct":26},"50",{"key":28,"text":336,"correct":22},"60",{"key":31,"text":123,"correct":26},{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":20,"analysis":33},1170409,"轻集料混凝土小型砌块试验批量每批不超过（）万块。",[342,344,346,348],{"key":20,"text":343,"correct":22},"1",{"key":24,"text":345,"correct":26},"2",{"key":28,"text":347,"correct":26},"3",{"key":31,"text":349,"correct":26},"4",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":31,"analysis":33},1170410,"通水试验记录检测报告按（）列细目录。",[354,356,358,360],{"key":20,"text":355,"correct":26},"非承压系统",{"key":24,"text":357,"correct":26},"承压系统",{"key":28,"text":359,"correct":26},"系统",{"key":31,"text":283,"correct":22},{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},1170411,"施工检测计划由（）签字。",[365,367,369,371],{"key":20,"text":366,"correct":26},"项目负责人",{"key":24,"text":368,"correct":22},"专业监理工程师",{"key":28,"text":370,"correct":26},"专业质量员",{"key":31,"text":372,"correct":26},"项目经理",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":31,"analysis":33},1170412,"某建筑公司甲项目部承建某学校办公楼的施工任务。该办公楼为六层钢筋混凝土框架结构、柱下条型基础，建筑面积为10000㎡.工程于2001年7月20日开工，至2012年12月20日完工并通过了竣工验收。 甲项目部资料员收集的“砂、石进行场复验报告”应归属于（）类。",[377,379,381,383],{"key":20,"text":378,"correct":26},"施工管理文件Cl",{"key":24,"text":380,"correct":26},"施工技术文件C2",{"key":28,"text":382,"correct":26},"进度造价文件C3",{"key":31,"text":384,"correct":22},"施工物资出厂质量证明及进场检测文件C4",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},1170413,"施工单位填写的绝缘电阻测试记录应一式（）份。",[389,390,391,392],{"key":20,"text":289,"correct":26},{"key":24,"text":291,"correct":22},{"key":28,"text":293,"correct":26},{"key":31,"text":295,"correct":26},{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":31,"analysis":33},1170414,"调查单位填写的建设工程质量事故调查、勘查记录应一式（）份。",[397,398,399,400],{"key":20,"text":289,"correct":26},{"key":24,"text":291,"correct":26},{"key":28,"text":293,"correct":26},{"key":31,"text":295,"correct":22},{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1170415,"工程概况表资料来源单位为（）单位",[405,407,409,411],{"key":20,"text":406,"correct":22},"施工",{"key":24,"text":408,"correct":26},"供货",{"key":28,"text":410,"correct":26},"检测",{"key":31,"text":412,"correct":26},"监理",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},1170416,"施工单位整理汇总的图纸会审记录应一式（）份。",[417,418,419,420],{"key":20,"text":289,"correct":26},{"key":24,"text":291,"correct":26},{"key":28,"text":293,"correct":26},{"key":31,"text":295,"correct":22},{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1170417,"钢筋机械连接试验报告资料来源单位为（）单位。",[425,426,428,429],{"key":20,"text":410,"correct":22},{"key":24,"text":427,"correct":26},"设计",{"key":28,"text":406,"correct":26},{"key":31,"text":412,"correct":26},{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},1170418,"对于归档工程文件材料质量要求不正确的是（）。",[434,436,438,440],{"key":20,"text":435,"correct":26},"字迹清楚",{"key":24,"text":437,"correct":22},"线条美观",{"key":28,"text":439,"correct":26},"图表整洁",{"key":31,"text":441,"correct":26},"签章完备",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},1170419,"卷内目录中的序号以（）为单位，用阿拉伯数字从1依次标注。",[446,448,450,452],{"key":20,"text":447,"correct":22},"一份文件",{"key":24,"text":449,"correct":26},"一类文件",{"key":28,"text":451,"correct":26},"一页文件",{"key":31,"text":453,"correct":26},"A4文件纸",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":28,"analysis":33},1170420,"建设单位在工程竣工验收后（）个月内，必须向城建档案馆（室）移交一套符合规定的工程档案。",[458,459,460,461],{"key":20,"text":343,"correct":26},{"key":24,"text":345,"correct":26},{"key":28,"text":347,"correct":22},{"key":31,"text":349,"correct":26},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},1170421,"土工击实试验报告资料来源单位为（）单位。",[466,467,468,469],{"key":20,"text":406,"correct":26},{"key":24,"text":427,"correct":26},{"key":28,"text":410,"correct":22},{"key":31,"text":412,"correct":26},{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},1170422,"施工单位填写的工程概况表与施工组织设计同步完成并应一式（）份。",[474,475,476,477],{"key":20,"text":289,"correct":26},{"key":24,"text":291,"correct":26},{"key":28,"text":293,"correct":22},{"key":31,"text":295,"correct":26},{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":28,"analysis":33},1170423,"施工单位填写的单位（子单位）工程质量控制资料检查记录应一式（）份。",[482,483,484,485],{"key":20,"text":289,"correct":26},{"key":24,"text":291,"correct":26},{"key":28,"text":293,"correct":22},{"key":31,"text":295,"correct":26},{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},1170424,"3C标志资料来源单位为（）单位。",[490,491,492,493],{"key":20,"text":406,"correct":26},{"key":24,"text":408,"correct":22},{"key":28,"text":410,"correct":26},{"key":31,"text":412,"correct":26},{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":20,"analysis":33},1170425,"施工单位填报的监理工程师通知回复单应一式（）份。",[498,499,500,501],{"key":20,"text":289,"correct":22},{"key":24,"text":291,"correct":26},{"key":28,"text":293,"correct":26},{"key":31,"text":295,"correct":26},{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":31,"analysis":33},1170426,"长期是指工程档案的保存期限为（）。",[506,508,510,512],{"key":20,"text":507,"correct":26},"100年",{"key":24,"text":509,"correct":26},"70年",{"key":28,"text":511,"correct":26},"50年",{"key":31,"text":513,"correct":22},"该工程的使用寿命",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":28,"analysis":33},1170427,"外加剂试验报告资料来源单位为（）单位。",[518,519,520,521],{"key":20,"text":406,"correct":26},{"key":24,"text":408,"correct":26},{"key":28,"text":410,"correct":22},{"key":31,"text":412,"correct":26},{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},1170428,"工程开工报审表由（）编制。",[526,528,530,532],{"key":20,"text":527,"correct":26},"施工员",{"key":24,"text":529,"correct":26},"项目技术负责人",{"key":28,"text":531,"correct":26},"质量员",{"key":31,"text":372,"correct":22},{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},1170429,"下列案卷内文字材料排列顺序错误的是（）",[537,539,541,543],{"key":20,"text":538,"correct":26},"批复在前、请示在后",{"key":24,"text":540,"correct":22},"定稿在前、印本在后",{"key":28,"text":542,"correct":26},"主体在前、附件在后",{"key":31,"text":544,"correct":26},"按事项、专业顺序排列",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},1170430,"综合布线测试记录按（）列细目录。",[549,551,552,553],{"key":20,"text":550,"correct":26},"分部",{"key":24,"text":279,"correct":22},{"key":28,"text":281,"correct":26},{"key":31,"text":283,"correct":26},[555,558,561,564,567,570],{"id":15,"name":556,"category":7,"favorite":557},"领导干部任职前廉政法规知识测试题",92,{"id":559,"name":560,"category":7,"favorite":15},595,"建筑结构与设备",{"id":562,"name":563,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":565,"name":566,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":568,"name":569,"category":7,"favorite":8},534,"BIM工程师",{"id":571,"name":569,"category":7,"favorite":8},535]