[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-834-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},834,"(资料员)专业管理实务 岗位知识","建筑工程",0,18,50,1056,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1170983,3,"判断题","工程材料质量保证书应由施工单位提交，监理单位审核。（）",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1170984,"依据《建筑工程资料管理规程》划分资料类别。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1170985,"依据《建筑工程质量验收统一标准》确定施工项目的分部、分项、检验批。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":25,"analysis":27},1170986,"施工检测计划应由施工单位报审，建设单位审核。（）",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1170987,"资料管理计划仅对资料的收集归档管理及保管使用工作进行有效控制。（）",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1170988,"监理管理资料是指监理单位实施工程项目施工监理过程中形成的技术性资料。（）",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1170989,"呈送上级单位的工程文件由工程部领导确定发放单位和数量。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1170990,"施工资料按照《建筑工程资料管理规程》可分为七大类。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1170991,"工程档案一般不少于两套，一套由施工单位保管，一套（原件）移交当地城建档案馆（室）。（）",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1170992,"在保证资料归档份数，应按技术负责人审定的工程文件分发表及时分发给有关单位和部门。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":25,"analysis":27},1170993,"卫生器具满水试验记录属于安全功能资料。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1170994,"对接受的保密机文件，要严格按保密规定妥善收存，并认真执行密级文件资料的借阅规定。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1170995,"施工资料中的设计变更、洽商记录中有正文及附图应组合在一起，按附图在前、正文在后顺序排列。（）",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1170996,"施工资料按照《建设工程文件归档整理规范》可分为五大类。",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1170997,"设备资料文件不足部分，施工单位可自行联系复制。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1170998,"建立资料台账时，施工资料应该按照先后顺序分类，对同一类型的资料应按照时间先后顺序进行排序。（）",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1170999,"属于单位工程整体管理内容的资料，编号中的分部、子分部工程代号可用“00”代替。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1171000,"施工图资料不足部分施工单位可委托档案资料室向设计院提出增加施工图供应数量。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1171001,"上级主管机关所发的文件由档案资料室统一接收。",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1171002,"幕墙三性检测报告属于使用功能资料。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1171003,"建筑智能化系统检测报告属于质量控制资料。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1171004,"资料台账工作是工程建设过程的一部分，应纳人建设全过程管理并与工程建设同步。（）",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},1171005,"电梯安全装置检测报告属于主要功能资料。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1171006,"资料员指导项目经理收发文件。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1171007,"卷内目录、卷内备考表、案卷内封面应采用80克以上白色书写纸制作，幅面统一采用A4幅面。（）",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1171008,"项目经理职责为主持编制项目管理规划，归集工程资料，准备结算资料，组织工程竣工验收。（）",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1171009,"施工资料的形成流程包括施工技术资料管理流程、施工物资资料管理流程和施工质量验收记录管理流程等。（）",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1171010,"图纸应先按专业分开，再按图号排列。（）",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1171011,"专业分包单位编制的分部（分项）工程或专项工程的施工方案，交由总包单位技术负责人审核。（）",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1171012,"资料员负责试验报告单的验证确认。",[200,201],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":25,"analysis":27},1171013,"施工执行标准栏，填写国家标准名称编号。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":21,"analysis":27},1171014,"施工单位栏填写施工合同文件中的签章单位的全称，与签章上的名称一致。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1171015,"施工安全日志应装订成册，填写错撕掉作废。工程项目部安全负责人应定期对安全日志进行检查，并签名示以负责。（）",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1171016,"工程文件资料与工程建设同步形成的含义并不是非常严格的侗时”，而是要求工程资料与工程进度应基本保持对应、及时形成。（）",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1171017,"分部工程按表列参与工程建设责任单位的有关人员亲自签字，以示负责。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1171018,"分项工程通常起一个归纳整理的作用，是一个统计表，没有实质性的验收内容。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1171019,"工程施工过程中，原件数量往往难以满足对资料份数的需求，因此在工程资料中，允许采用复印件，提供单位应在复印件上加盖单位印章，并应有经办人签字及日期。（）",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1171020,"对定性项目，填写检查的数据。",[248,249],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1171021,"建设单位项目负责人栏应填写合同书上签字人。",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1171022,"竣工图合并装订在土建工程资料后。（）",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1171023,"用于墙面抹灰的水泥，进场取样复验的项目为强度和安定性。（）",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1171024,"施工单位检查结果评定施工班组长应由本人签字。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":21,"analysis":27},1171025,"对定量项目根据规范要求的检查数量直接填写检查的数据。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1171026,"监理单位必须签认所有分部工程。",[284,285],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1171027,"设计单位必须签认所有分部工程。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":21,"analysis":27},1171028,"质量验收规范在制表时就己填写好。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1171029,"设计单位栏填写设计合同文件中的签章单位的名称，与合同签章上的单位名称相同。",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1171030,"分部工程验收表头部分除结构类型和层数外，其余项目与检验批、分项工程、单位工程验收表的内容一致。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1171031,"质量控制资料由施工单位和监理单位共同核查。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1171032,"建设单位栏填写合同文件中的甲方单位，与合同签章上的单位名称相同。",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]