[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-834-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},834,"(资料员)专业管理实务 岗位知识","建筑工程",0,17,50,1056,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1170933,3,"判断题","监理资料移交书属于B6类资料。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1170934,"预拌混凝土供应单位应随车向施工单位提供《预拌混凝土运输单》，《预拌混凝土运输单》的正本由施工单位保存，副本有供应单位保存。（）",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1170935,"按《建设工程文件归档规范》(GB\u002FT50328一2014）的规定的类别和顺序排列。施工文件排列顺序是B类。（）",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1170936,"工程竣工验收中必须完成工程项目按照工程设计和合同约定的全部内容。",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1170937,"建筑业统计的范围是根据调查的任务，结合考虑需要而确定的统计调查所应该包含的单位。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1170938,"监理工程师通知属于B2类资料。",[56,57],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1170939,"材料3C强制认证合格证书属于C3类资料。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1170940,"建筑电气竣工图属于C8类资料。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1170941,"施工资料移交书属于C8类或E3类资料。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1170942,"工程竣工验收报告属于E1类资料。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1170943,"建筑业统计的对象是建筑业生产经营活动的数量表现。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1170944,"不属于归档范围、没有保存价值的工程文件，文件形成单位可自行组织销毁。（）",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1170945,"监理规划属于B1类资料。",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1170946,"卷内备考表应排列在卷内文件的尾页之后。（）",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":25,"analysis":27},1170947,"建筑业统计的调查单位是建设行政管理部门组建机构。（）",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1170948,"当文件无标题时，应根据内容拟写标题，拟写标题外应加“[]”符号。（）",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},1170949,"旁站监理记录属于B2类资料。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1170950,"建设单位收集和整理工程准备阶段、竣工验收阶段形成的文件。",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1170951,"设备单机试运转属于C6类资料。",[134,135],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1170952,"施工资料预验收由监理单位组织，建设单位、施工单位项目负责人及档案员参加，城建档案机构负责审验。（）",[140,141],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1170953,"归档的工程文件应为原件。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":25,"analysis":27},1170954,"监理等单位应将本单位形成的工程文件立卷后向建设单位移交。（）",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},1170955,"施工文件应按建设程序、形成单位进行立卷。（）",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1170956,"施工检查记录属于C5类资料。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1170957,"进口的主要材料设备的商检证明文件属于C3类资料。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1170958,"所有竣工文件均应加盖竣工图章。（）",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1170959,"卷内备考表不编写页号。（）",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1170960,"检验批验收记录属于C8类资料。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1170961,"混凝土抗压强度试验报告属于C6类资料。",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1170962,"竣工验收文件是监理单位在建设工程项目竣工验收活动中形成的文件。（）",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":25,"analysis":27},1170963,"淋水试验持续时间不得少于24h；做蓄水检查的屋面，蓄水时间不得少于2h。（）",[206,207],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1170964,"竣工新貌影像资料属于E2类资料。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1170965,"监理资料移交书属于B6类或E3类资料。",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1170966,"地形测量和拨地测量成果报告来源于规划部门。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1170967,"施工文档资料在完成收文登记后，应依照相关的分级、分类方法进行存放。（）",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1170968,"应加强对计算机及其他信息设备的使用管理，凡涉及保密资料的电子设备、通信和办公自动化系统均应符合保密要求。",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1170969,"编报的统计报表要按现场实际完成情况严格审查核对，不得多报、早报、重报、漏报",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1170970,"资料室（库）照明应选择紫外线光源。（）",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1170971,"施工文档资料管理单位应按施工文档资料分类和编号要求发文，并在发文登记簿上登记。（）",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1170972,"协助项目经理做好对外协调、接待工作：协助项目经理对内协调公司、部门间，对外协调施工单位间的工作。做好与有关部门及外来人员的联络接待工作，树立企业形象。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1170973,"单位工程施工完工后，先由监理单位组织预验收。（）",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1170974,"工程技术文件应由施工单位报审，监理单位审核。（）",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1170975,"隐蔽工程验收记录文件应由设计单位形成，监理单位审核。（）",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1170976,"依据《建筑工程施工资料计划编制导则》确定资料来源、内容及标准。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1170977,"工程洽商文件应由设计单位报审，监理单位审核。（）",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1170978,"施工试验记录应由试验检测单位编制检测计划，监理单位审核。（）",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1170979,"施工单位申报单位工程验收记录及相关资料、竣工验收报告、施工工程总结，应在监理单位预验收后。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":21,"analysis":27},1170980,"资料管理计划既可以追溯施工文件档案资料的形成单位、传递途径、保存的范围和涉及的相关责任人。（）",[308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1170981,"单位（子单位）工程观感质量检查记录表中抽查质量状况结果填写为○的表示符合要求。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":25,"analysis":27},1170982,"资料管理计划仅对资料的形成管理过程进行有效控制。（）",[320,321],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]