[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171175":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1171175,834,3,"判断题","项目经理应先编制“项目管理实施规划”，再与企业法定代表人签订“项目管理责任书”。（）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"项目经理接受企业法定代表人的委托组建项目经理部，企业法定代表人与项目经理签订“项目管理目标责任书”，项目经理部编制“项目管理实施规划”,进行项目开工前的准备",{"id":6,"name":21,"category":22,"favorite":23},"(资料员)专业管理实务 岗位知识","建筑工程",0]