[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171101":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1171101,834,3,"判断题","勘察、设计、施工单位向城建档案馆移交工程档案时，应编制移交清单、双方签字盖章后进行移交。（）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"勘察、设计、施工单位在收齐工程文件并整理立卷后，建设单位、监理单位应根据城建档案管理机构的要求对档案文件完整、准确、系统情况和案卷质量进行审查。审查合格后向建设单位移交。",{"id":6,"name":21,"category":22,"favorite":23},"(资料员)专业管理实务 岗位知识","建筑工程",0]