[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171048":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1171048,834,3,"判断题","作业班（组）长于每班工作开始前必须对本班（组）全体人员进行班前安全交底，并填写施工现场班（组）班前讲话记录表。本表可以班（组）为单位或工程项目为单位装订成册。（）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"作业班（组）长于每班工作开始前必须对本班（组）全体人员进行班前安全交底，并填写施工现场班（组）班前讲话记录表。本表可以班（组）为单位或工程项目为单位装订成册。",{"id":6,"name":21,"category":22,"favorite":23},"(资料员)专业管理实务 岗位知识","建筑工程",0]