[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171044":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1171044,834,3,"判断题","观感质量验收应以总监理工程师或建设单位项目技术负责人为主导共同确定质量评价。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"观感质量验收应以总监理工程师或建设单位项目经理为主导共同确定质量评价。",{"id":6,"name":21,"category":22,"favorite":23},"(资料员)专业管理实务 岗位知识","建筑工程",0]