[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171027":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1171027,834,3,"判断题","设计单位必须签认所有分部工程。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"设计单位可只签认地基基础、主体结构及重要安装分部（子分部）工程，由项目负责人亲自签认。",{"id":6,"name":21,"category":22,"favorite":23},"(资料员)专业管理实务 岗位知识","建筑工程",0]