[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1171016":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1171016,834,3,"判断题","工程文件资料与工程建设同步形成的含义并不是非常严格的侗时”，而是要求工程资料与工程进度应基本保持对应、及时形成。（）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"工程文件资料与工程建设同步形成的含义并不是非常严格的侗时”，而是要求工程资料与工程进度应基本保持对应、及时形成",{"id":6,"name":21,"category":22,"favorite":23},"(资料员)专业管理实务 岗位知识","建筑工程",0]