[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170915":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1170915,834,3,"判断题","建设单位应当自工程竣工验收合格之日起15日内，向工程所在地的市级以上地方人民政府建设行政主管部门备案。（）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"工程竣工验收备案应在建设工程竣工验收合格之日起15个工作日内，向建设行政主管部门备案。",{"id":6,"name":21,"category":22,"favorite":23},"(资料员)专业管理实务 岗位知识","建筑工程",0]