[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170871":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1170871,834,2,"多选题","施工企业法定代表人与项目经理协商制定项目管理目标责任书的依据包括（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目设计文件",false,{"key":16,"text":17,"correct":18},"B","项目合同文件",true,{"key":20,"text":21,"correct":18},"C","组织的管理制度",{"key":23,"text":24,"correct":18},"D","项目管理规划大纲",{"key":26,"text":27,"correct":18},"E","组织的经营方针和目标","BCDE","项目责任书编制依据编辑1.项目合同文件2.组织的管理制度3.项目管理规划大纲4.组织的经营方针和目标",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)专业管理实务 岗位知识","建筑工程",0]