[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170858":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1170858,834,2,"多选题","施工阶段的相关资料主要包括（）",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","进度控制资料",true,{"key":16,"text":17,"correct":14},"B","质量控制资料",{"key":19,"text":20,"correct":14},"C","造价控制资料",{"key":22,"text":23,"correct":14},"D","合同控制资料",{"key":25,"text":26,"correct":27},"E","材料控制资料",false,"ABCD","",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)专业管理实务 岗位知识","建筑工程",0]