[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170850":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1170850,834,2,"多选题","变配电室包括（）分项。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","变压器、箱式变电所安装",true,{"key":16,"text":17,"correct":14},"B","控制柜（屏、台）和动力、照明配电箱（盘）安装",{"key":19,"text":20,"correct":14},"C","封闭母线安装",{"key":22,"text":23,"correct":24},"D","重复接地安装",false,{"key":26,"text":27,"correct":24},"E","电缆导管敷设","ABC","分部（子分部）工程、分项工程、检验批划分及代号索引表格当中分部工程代号06，子分部工程代号02。",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)专业管理实务 岗位知识","建筑工程",0]