[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170785":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1170785,834,2,"多选题","某施工单位承担了11层钢筋混凝土框剪结构住宅楼的施工任务。施工单位的资料资对施工资料进行了收集，并对收集的施工资料进行处理、存储、检索、传递、追溯和应用。资料员在对施工资料的管理中，遇到以下问题，试问应如何处理。 某施工单位现场资料员在收集了下列工程资料，进行分类存储时归于施工质量验收文件的是是（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","钢筋进场复验报告",false,{"key":16,"text":17,"correct":18},"B","混凝土强度检验报告",true,{"key":20,"text":21,"correct":14},"C","砂浆强度统计表",{"key":23,"text":24,"correct":18},"D","模板搭设检验批验收记录表",{"key":26,"text":27,"correct":14},"E","钢筋绑扎检验批验收记录表","BD","混凝土强度检验报告、模板搭设检验批验收记录表在分类存储时归于施工质量验收文件",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)专业管理实务 岗位知识","建筑工程",0]