[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170751":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1170751,834,2,"多选题","工程准备阶段文件是指建筑工程开工前，在（）等工程准备阶段形成的文件。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","立项",true,{"key":16,"text":17,"correct":14},"B","审批",{"key":19,"text":20,"correct":21},"C","监理",false,{"key":23,"text":24,"correct":14},"D","征地",{"key":26,"text":27,"correct":14},"E","招标投标","ABDE","工程准备阶段文件是指建筑工程开工前，在立项、审批、征地、招标投标等工程准备阶段形成的文件。",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)专业管理实务 岗位知识","建筑工程",0]