[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170730":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1170730,834,2,"多选题","工程准备阶段文件、工程竣工文件宜按《建筑工程资料管理规程》中规定的（）顺序编号。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","单位",false,{"key":16,"text":17,"correct":18},"B","形成时间",true,{"key":20,"text":21,"correct":14},"C","分部",{"key":23,"text":24,"correct":14},"D","子分部",{"key":26,"text":27,"correct":18},"E","类别","BE","工程准备阶段文件、工程竣工文件宜按《建筑工程资料管理规程》中规定的类别和形成时间顺序编号。",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)专业管理实务 岗位知识","建筑工程",0]