[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170727":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1170727,834,2,"多选题","单位工程预验收时应形成（）资料。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","质量控制资料核查表",false,{"key":16,"text":17,"correct":14},"B","安全和功能检验资料及主要功能核查记录",{"key":19,"text":20,"correct":21},"C","施工工程总结",true,{"key":23,"text":24,"correct":21},"D","竣工验收报告",{"key":26,"text":27,"correct":21},"E","单位工程验收记录及相关资料","CDE","图8-6中单位工程验收形成的资料包括：单位工程验收记录及相关资料；竣工验收报告；施工工程总结。",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)专业管理实务 岗位知识","建筑工程",0]