[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170717":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1170717,834,2,"多选题","施工单位填报的监理工程师通知回复单应由（）保存。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","建设单位",false,{"key":16,"text":17,"correct":18},"B","施工单位",true,{"key":20,"text":21,"correct":14},"C","建立单位",{"key":23,"text":24,"correct":14},"D","城建档案馆",{"key":26,"text":27,"correct":18},"E","监理单位","BE","施工单位填写的监理工程师通知回复单应一式两份，并由监理单位、施工单位各保存一份。见第五章第四节P60。Z5.4.3施工技术资料主要包括的表格类型以及各种表格的形式要求以及涉及到的单位。（P61）单选题1.",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)专业管理实务 岗位知识","建筑工程",0]