[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170685":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1170685,834,2,"多选题","设计变更通知单归档保存的单位是（）单位。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","施工",true,{"key":16,"text":17,"correct":14},"B","监理",{"key":19,"text":20,"correct":14},"C","建设",{"key":22,"text":23,"correct":14},"D","城建挡案馆",{"key":25,"text":26,"correct":14},"E","设计","ABCDE","C2施工技术文件，设计变更通知单必须归档保存的有建设单位，设计单位，施工单位，监理单位，城建档案馆",{"id":6,"name":30,"category":31,"favorite":32},"(资料员)专业管理实务 岗位知识","建筑工程",0]