[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170680":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1170680,834,2,"多选题","工程文件应按不同的形成、整理单位及建设程序，按（）分别进行立卷，并可根据数量多少组成一卷或多卷。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程准备阶段文件",true,{"key":16,"text":17,"correct":18},"B","质量控制文件",false,{"key":20,"text":21,"correct":14},"C","监理文件",{"key":23,"text":24,"correct":14},"D","施工文件",{"key":26,"text":27,"correct":14},"E","竣工图、竣工验收文件","ACDE","程文件应按不同的形成、整理单位及建设程序，按工程准备阶段文件、监理文件和施工文件、竣工图、竣工验收文件分别立卷，并可根据数量多少组成一卷或多卷",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)专业管理实务 岗位知识","建筑工程",0]