[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170649":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1170649,834,2,"多选题","工程前期的资料主要包括（）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","工程地质勘察报告",true,{"key":16,"text":17,"correct":14},"B","建设工程施工许可证",{"key":19,"text":20,"correct":21},"C","工程质量验收报告",false,{"key":23,"text":24,"correct":14},"D","工程建设项目批准文件",{"key":26,"text":27,"correct":14},"E","工程建设规划批准文件","ABDE","工程前期移交的资料主要包括：（1）工程地质勘察报告；（2）建设工程施工许可证；（3）工程建设项目批准文件；（4）工程建设规划批准文件。",{"id":6,"name":31,"category":32,"favorite":33},"(资料员)专业管理实务 岗位知识","建筑工程",0]