[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170636":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1170636,834,2,"多选题","施工过程管理形成的工程文件资料有（）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","编制施工组织设计",true,{"key":16,"text":17,"correct":14},"B","开工报告",{"key":19,"text":20,"correct":14},"C","图纸会审、技术交底记录",{"key":22,"text":23,"correct":14},"D","施工现场质量管理检查记录",{"key":25,"text":26,"correct":14},"E","施工方案","ABCDE","工程质量管理资料1、开工报告（工程开工报审表）2、施工组织设计3、施工工序方案4、图纸会审、技术交底记录5、施工日志6、预检工程记录7、施工现场质量管理检查记录8、工程竣工施工总结9、工程竣工报告10、交工验收证书11、工程质量保",{"id":6,"name":30,"category":31,"favorite":32},"(资料员)专业管理实务 岗位知识","建筑工程",0]