[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170514":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1170514,834,1,"单选题","某建筑公司甲项目部承建某学校办公楼的施工任务。该办公楼为六层钢筋混凝土框架结构、柱下条型基础，建筑面积为10000㎡.工程于2001年7月20日开工，至2012年12月20日完工并通过了竣工验收。 浇筑混凝土前，对钢筋、模板隐蔽验收形成的“隐蔽工程验收记录”属于施工（）类。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","记录文件C5",true,{"key":16,"text":17,"correct":18},"B","试验记录及检测文件C6",false,{"key":20,"text":21,"correct":18},"C","质量验收文件C7",{"key":23,"text":24,"correct":18},"D","验收文件C8","浇筑混凝土前，对钢筋、模板隐蔽验收形成的“隐蔽工程验收记录”属于施工记录文件C5类。",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)专业管理实务 岗位知识","建筑工程",0]