[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1170477":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1170477,834,1,"单选题","某建筑公司项目经理部整理竣工图时，立卷按（）立卷。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建设程序、形成单位",false,{"key":16,"text":17,"correct":14},"B","单位工程、分部工或专业、阶段",{"key":19,"text":20,"correct":21},"C","单位工程分专业",true,{"key":23,"text":24,"correct":14},"D","单位工程、分部工程、分项工程和检验批","一项建设工程由多个单位工程组成时，工程文件应按单位工程立卷",{"id":6,"name":27,"category":28,"favorite":29},"(资料员)专业管理实务 岗位知识","建筑工程",0]